DER Power System Services

DERlab Workshop Series

Workshop: Power System Services
31st March 2011, 13:00-16:00
Risø DTU - Risø Campus Roskilde (DK)
H.H. Koch Auditorium

This workshop is part of the Risø open seminar. The abstracts of the presentations are on the Risø webpages.

Time Topic Speaker
13:00 - 13:10 Workshop introduction Henrik Bindner, Senior Scientist, IES, Risø DTU
13:10 - 13:50 Real-time power hardware in the loop - The future of testing [2.208 KB] Dr. Erik de Jong, KEMA Nederland N.V.
13:50 - 14:30 Power system services provided by inverter connected distributed energy resources [601 KB] Fridrik Isleifsson, PhD student, IES, Risø DTU
14:30 - 15:00 Coffee Break  
15:00 - 15:30 Power System Services of PV-systems: Requirements, testing and application in Germany [1.708 KB] Dominik Geibel, Fraunhofer IWES
15:30 - 16:00 Ancillary Services from Wind Farms [1.715 KB] Dr. Nicolaos A. Cutululis, WES, Risø DTU
16:00 End of workshop  

 

back to top


3rd DERlab Workshop on Power System Services: Network Integration and system services
5th April 2011, 16:45-17:15
at the MicrogenII Conference, Glasgow (UK)

Power System Services are discussed also at the industry day of the MicrogenII conference.

Session 5: Network Integration and system services in association DERlab
CHAIR: Per Norgaard, Risø DTU, Denmard and Prof. Graeme Burt, University of Strathclyde, UK

Time Topic Speaker
15:55 - 16:15 Overview of DERlab activities in Power System Services Per Norgaard, Senior Engineer, Riso DTU
16:15 - 16:35 Microgeneration and its role in a changing energy network Dave OpenShaw, Head of Future Networks, UK Energy Networks
16:35 - 16:55 Distributed voltage control using inverter connected DERs Fridrik Rafn, Researcher, Riso DTU
16:55 - 17:15 Panel Session  

The aim of the work of DERlab in Power System Services is:
- To define and characterise power system services, in terms of functionality, timescale, power / energy,
means of activation, in a general, technology independent manner.
- To propose testing methods for testing DER components power system services, for single units and for
aggregated response.
- For the background information, download the discussion paper [203 KB]

More background information can be found in this leaflet [132 KB] .

back to top


2nd DERlab workshop: DER Power System Services
19th October 2010, 14:00 - 18:00
before the SmartGrids and E-Mobility Conference
Bedford Hotel & Congress Centre, 135-137 Rue du Midi, 1000 Brussels (Belgium)

This workshop focuses on verification of power system services provided by the aggregated response from several individual and Distributed Energy Resources (DER) units. Only active and reactive power responses will be addressed. In most cases, the verification has to be carried out in situ with no on line registration of the individual responses. Examples of different control concepts will be presented as an input to the discussion.

The workshop aims to define power system services, in terms of functionality, timescale, power and energy, means of activation, in a general, technology-independent manner and also to propose testing methods for testing DER components power system services.

Download the workshop programme [317 KB] .

Download the discussion paper [203 KB] for the workshop.

Workshop presentations:
Introduction [829 KB]
Summary of the 1st PSS workshop in April 2010 [67 KB] by Paul Crolla
The FlexPower project [199 KB] by Per Norgaard
The FENIX project [1.392 KB] by Martin Braun
Regenerative model region of Harz [2.749 KB] by Florian Schlögl